Planning Application
In summer 2023, HYRO submitted a planning application for a Green Hydrogen Electrolyser (GHE) production and storage facility approximately 1km north-west of the town of Flint in North Wales.
Electronic copies of the planning application and accompanying documents can be viewed or downloaded by clicking on the links below.
The application is also available to view on the Flint County Council website at https://planning.agileapplications.co.uk/flintshire/search-applications/ and by searching reference number: FUL/000599/23
- Cover letter
- EIA screening request
- Planning, Design and Access Statement
- Landscape and Visual assessment
- Landscape masterplan
- Air Quality & Dust Risk Assessment
- Arboriculture Impact Assessment
- Tree Impact Plan
- Coal Mining Assessment
- Cultural Heritage Desktop Survey
- Flood Risk Screening and Drainage Management Plan
- Noise Assessment
- Noise Survey Data
- Preliminary Ecology Assessment
- Preliminary Ecology Assessment Addendum
- Transport Statement
- Pre-application Consultation Report
Figures
- Location Plan
- Infrastructure Layout Plan
- Utility Connections Drawing
- Auxiliary Transformer
- Compressor
- DNO Substation Building
- Emergency Vent Stack
- Feed Water Tank
- GCE Harmonic Filter
- Hydrogen Electrolyser
- Hydrogen Facility Substation Building
- Hydrogen Storage
- Air Unit
- Low Pressure Buffer_20ft Container
- Low Pressure Buffer_40ft Container
- Meter Cabinet
- Nitrogen Storage Tank
- Odourisation System
- Office and Spares Container
- Pre-Insertion Resistor
- Pressure Let Down System and Safety Valve
- Typical Lighting and CCTV Column
- Typical Security Fence Details
- Typical Services Support Frame
- Typical Vehicle Barrier
- Uninterruptible Power Supply Unit
- Site elevation drawing
In June 2024, Flintshire County Council granted the scheme planning consent.